Reference NumberDROU/D16/93
TitleCulvert of Mousesweet Brook under Mineral Railway at Dudley Wood
DescriptionFile No. 90.C.
Correspondence re: the culvert under the Mineral Railway at Dudley Wood, at which flooding was occurring on the upstream side of Mousesweet Brook. Round Oak Steel Works proposed a reconstruction of the culvert in order to prevent further flooding. Includes a survey of the Mousesweet Brook culvert with proposed reconstruction.
DateJul 1955-Sep 1958
AccessStatusOpen
LevelItem
    Powered by CalmView© 2008-2026