Reference NumberDE/5/9/84
TitleSection of Proposed Foul Sewer, Springhead to Pumping Station, Goldthorn Park Estate
DescriptionColoured. Pencil annotation. Distances given in feet and inches. Longitudinal section showing pipes, fences, manholes and hedges. Separate section showing area between manholes 16 and 20. Bundled with two other plans.

Surveyor: W. Evans

Scale: Horizontal : 1:500 Vertical: 8 feet to 1" [1:96]
Datec.1930s
Related Material[bundled with DE/5/9/84 - DE/5/9/86]
Physical Description[282cm x 53cm]
AccessStatusOpen
Extent[3 items]
LevelItem
    Powered by CalmView© 2008-2025